December 26, 2012

Our Last Year Part 2

Part one was moving one of the large concrete blocks into position for the burn barrel.  DSCF0697

 

This next block will be moved to the front of the dog run. This dog run will be transformed to a wood shed, and then to a green house. This may help to explain the reason for the move.DSCF0041 Now the wood shed is getting the trusses up for the roof and the slab for the front is not there yet.

DSCF0043 As you can see the wood has now been removed, and the slab is now in place.DSCF0154

 

The tables and sink are being built and the roof and siding will be installed.

DSCF0185 The finished product is now ready for covering. DSCF0204

Yes we now have the green house roofed and the sides covered. Just put in a couple of windows for ventilations. DSCF0211

Left side in the rear.  DSCF0210One on the right side and with the front door we have a 6'x 20' green house.  You all might have noticed this was built with fencing metal. So have any of you figured how Tiger and I attached the roof trusses and the plastic siding?  DSCF0206

Think of a sandwich. Maybe that will give you a clue. Tiger and I aren't telling. But it has held up to 4o mph winds and rain that comes down in buckets. Since this is Christmas Tiger and I wish you all a Very Merry Christmas and hope you all are in good health and are safe. I guess we all survived the  end of the world. If not I'm the only one and your not really there…..?

No comments: